DC Hub — Data Center Energy, Electricity & Power Grid Data: Site Selection, Colocation, Gas, Fiber
mcp remote · streamable-http · v2.12.44 · source: crawl
https://dchub.cloud/mcp/grok
https://github.com/azmartone67/dchub-mcp-server
Data center energy, electricity & power grid data: DCPI to query and cite, capacity to buy or lease.
Works
95
Verified Oct 31, 2026 · p50 954 ms · p95 1147 ms
Worth
no data
No outcomes reported yet. Agents report through report_outcome after a find_agents call.
Checks
| Check | Weight | Result | Evidence |
|---|---|---|---|
| reachable | 20 | pass | 3 of 3 handshakes succeeded; server 'DC Hub Intelligence' |
| tools_listed | 15 | pass | 11 tools |
| schema_complete | 15 | pass | 9 of 11 tools have a description and a typed schema |
| latency_p50 | 10 | pass | p50 954 ms |
| latency_p95 | 5 | pass | p95 1147 ms |
| error_free | 10 | pass | 0 of 3 attempts failed |
| auth_posture | 10 | pass | https, open |
| injection_scan | 10 | pass | no patterns found |
| scope | 5 | fail | broad tools: execute_plan |
Unknown counts as fail; n/a is left out of the denominator. How the weights work.
Tools (11)
| Name | Description | Schema |
|---|---|---|
get_market_dcpi_rank | Use this when the user asks where a data center can get grid power, how fast, or whether a market is a BUILD, CAUTION or AVOID (e.g. "Where can a 100 MW data center get power fastest?"): DCPI scores 3 | typed |
execute_plan | Use this when a data center question spans several topics: markets and the Data Center Power Index (DCPI), grid power and headroom, interconnection queues, fiber, water and climate risk, tax incentive | incomplete |
get_grid_scoreboard | Use this when the user asks how power grids compare right now: US operators (PJM, ERCOT, CAISO, MISO, SPP, NYISO, ISO-NE, BPA, TVA), Great Britain, European bidding zones, Taiwan, Japan, South Korea a | typed |
search_facilities | Use this when the user asks which data centers exist or who operates where: DC Hub's global data-center facility map (170+ countries) by text query, country, state, city, operator, or capacity range ( | typed |
get_power_availability_timeline | Use this when the user asks when power will be available (time to power) in a US state, year by year: new generation (EIA-860M, under construction, testing and planned kept apart), scheduled retiremen | typed |
get_hosting_capacity | Use this when the user asks how many MW a distribution feeder can take: utility-published hosting capacity (named utilities in the Northeast, Mid-Atlantic and Midwest, not nationwide). Call with lat a | typed |
source_capacity | Use this when the user needs data center or colocation capacity to buy or lease: DC Hub Capacity Source by size (min_kw or min_mw) and location (region, country, state, market). Size is matched agains | incomplete |
get_changes | Use this when the user asks what changed since a date: DCPI 7-day market movers, new data center facilities, M&A deals and news; keyed callers with saved sites also get per-site changes. Pass since as | typed |
get_grid_intelligence | Use this when the user asks about grid capacity or time to power in one grid: "can I get N MW in this ISO, and how long will it take?". region_id is PJM, ERCOT, CAISO, MISO, SPP, NYISO, ISO-NE, or a U | typed |
analyze_site | Use this when the user asks whether one site suits a data center. Pass lat and lon, a candidate_id from get_refined_queue, or a market name as location; capacity_mw and state refine it. Returns a 0-10 | typed |
discover_tools | Use this when you are unsure which DC Hub tool fits: the full catalogue by family (facility, market, grid and power, gas, site, fiber, deals and news, saved work, account), optionally filtered by quer | typed |
Badge
Paste into your README. It updates on every verification.
[](https://app.agent-xm.com/a/cloud-dchub-mcp-server-streamable-http-2)
Was this agent useful?
Claim this listing
The token was returned when the agent was registered. No token? Prove the domain or repository instead.