DC Hub — Data Center Energy, Electricity & Power Grid Data: Site Selection, Colocation, Gas, Fiber
mcp remote · streamable-http · v2.12.44 · source: crawl
https://dchub.cloud/mcp/claude
https://github.com/azmartone67/dchub-mcp-server
Data center energy, electricity & power grid data: DCPI to query and cite, capacity to buy or lease.
Works
95
Verified Oct 31, 2026 · p50 637 ms · p95 1007 ms
Worth
no data
No outcomes reported yet. Agents report through report_outcome after a find_agents call.
Checks
| Check | Weight | Result | Evidence |
|---|---|---|---|
| reachable | 20 | pass | 3 of 3 handshakes succeeded; server 'DC Hub Intelligence' |
| tools_listed | 15 | pass | 67 tools |
| schema_complete | 15 | pass | 64 of 67 tools have a description and a typed schema |
| latency_p50 | 10 | pass | p50 637 ms |
| latency_p95 | 5 | pass | p95 1007 ms |
| error_free | 10 | pass | 0 of 3 attempts failed |
| auth_posture | 10 | pass | https, open |
| injection_scan | 10 | pass | no patterns found |
| scope | 5 | fail | broad tools: execute_plan |
Unknown counts as fail; n/a is left out of the denominator. How the weights work.
Tools (67)
| Name | Description | Schema |
|---|---|---|
search | Use this when you need a text search of data center facilities (search/fetch format). Returns {id, title, url}; pass an id to fetch. | typed |
fetch | Use this when you have an id from search and need that data center facility: {id, title, text, url, metadata} with operator, location, status, market. | typed |
execute_plan | Use this when a data center question spans several topics; answers it in one call. Pass the question as intent; a rule-based planner (no AI model) uses the text to choose the lookups (markets, grid, f | typed |
search_facilities | Use this when the user asks which data centers exist or who operates where: filter by name, country, state, city, operator, MW range or Uptime tier. | typed |
get_facility | Use this when the user asks about one data center facility (id, slug or name): operator, address, power capacity, cooling, fiber carriers, status, market DCPI verdict. | incomplete |
get_market_intel | Use this when the user asks about one data center market (slug): vacancy, capacity pricing, supply pipeline, main operators and growth. | typed |
get_market_dcpi_rank | Use this when the user asks whether a market has power for a data center: DCPI BUILD/CAUTION/AVOID verdict, score bands, time to power, data basis, narrative. | typed |
predict_market_trajectory | Use this when the user asks where a market's data center power outlook is heading: DCPI scores 1-8 quarters ahead, with confidence bands. | typed |
get_gas_index | Use this when the user asks which US states suit gas-fired data center power: the Data Center Gas Index (DCGI), per state. | typed |
get_grid_scoreboard | Use this when the user asks how power grids compare right now (US, GB, Europe, parts of Asia-Pacific and Latin America): demand, fuel mix, renewable and gas share. | typed |
compare_isos | Use this when the user wants 2-4 power grids side by side, e.g. "PJM,ERCOT" or "ERCOT,AESO,EU_DE_LU": fuel mix, demand, renewable and gas share; queue depth and time to power for the US ISOs. | typed |
get_intelligence_index | Use this when the user asks how healthy a data center market is: a 0-100 index of supply and demand, vacancy, absorption, fiber, power and pricing trend. | typed |
list_transactions | Use this when the user asks about data center M&A or capital deals since 2019: filter by buyer, seller, value, type, date or region. | typed |
get_news | Use this when the user asks for data center industry news: filter by keyword, category, source and date. | typed |
semantic_search | Use this when a data center or energy question is fuzzy: meaning-based search over news, deals, facilities and market analyses, with source fields. | typed |
search_intelligence | Use this when you need meaning-based search over DC Hub news, deals, facilities and analyses, choosing corpora by name (same retrieval as semantic_search). | typed |
get_market_context | Use this when you need a token-budgeted briefing on one data center market: DCPI verdict, power and grid, outlook, deals, pipeline, operators, risks, news. | typed |
get_iso_context | Use this when you need a token-budgeted briefing on one US power grid (ISO/RTO): live grid, DCPI verdicts, queue depth, benchmark prices, markets. | typed |
get_pipeline | Use this when the user asks what data centers are announced, permitted or under construction: filter by status, country, operator, MW or completion date. | typed |
source_capacity | Use this when the user needs data center or colocation capacity to buy or lease (powered land, powered shells, turnkey). Search DC Hub Capacity Source by size (min_kw or min_mw), region, location (cou | incomplete |
get_power_pipeline | Use this when the user asks where new US power generation is coming (EIA-860M, incl. non-ISO): filter by state, balancing authority, status or MW. | typed |
get_infra_projects | Use this when the user asks about planned gas pipeline or transmission line projects: filter by type, state, status, capacity, voltage, in-service date. | typed |
get_power_availability_timeline | Use this when the user asks when power gets easier in a US state (time to power): new generation by confidence, retirements, queue depth, year by year. | typed |
get_global_power | Use this when the user asks about power plants worldwide (Global Energy Monitor, all fuels, operating and pipeline): filter by country, fuel, status, size. | typed |
get_interconnection_queue | Use this when the user asks about interconnection queues: queued generation per US ISO, and ERCOT's large-load (data center) queue. | typed |
get_refined_queue | Use this when you need interconnection queue projects filtered server-side by size, wait, ISO, fuel, status, fiber distance or geography. | typed |
get_retirement_headroom | Use this when the user asks where retiring power plants free grid capacity for a target MW, with the nearest substations. | typed |
get_hosting_capacity | Use this when the user asks how many MW a distribution feeder can take near a site or market: utility-published hosting capacity. | typed |
analyze_parcel | Use this when the user has a land parcel (GeoJSON, or lat/lon in a hosted county): acreage, shape and nearby power infrastructure. | typed |
compare_sites | Use this when the user compares 2-4 data center sites ("lat,lon;lat,lon"): analyze_site scores side by side and the top site with the reason. Needs a DC Hub account with site-analysis access; without | typed |
rank_sites | Use this when you have candidate data center sites (lat/lng plus metrics) to rank under hard constraints and weighted objectives. | typed |
discover_tools | Use this when you are unsure which DC Hub tool fits: tools by family (facility, market, grid and power, gas, site, fiber, deals and news). | typed |
plan_query | Use this when you want the tool plan for a data center question without running it. | typed |
get_grid_data | Use this when the user asks for live electricity grid data for one grid: a US ISO, TVA, BPA, a US utility BA, Canada (IESO, AESO, HYDROQUEBEC), GB (NGESO), an ENTSO-E zone (EU_DE_LU), Taiwan, Japan, S | typed |
get_changes | Use this when the user asks what changed since a date: DCPI market movers, new data center facilities, deals and news. | typed |
get_facility_risk_delta | Use this when the user asks how a facility's market power risk (DCPI) changed over a window: improving, worsening or flat. | typed |
find_sites | Use this when the user has no site yet: candidate data center search areas in a state or near a point, by substation voltage and gas and fiber distance. | typed |
analyze_site | Use this when the user asks if one site suits a data center (lat/lon, candidate_id or market): 0-100 score with power, gas, fiber, market and risk sub-scores. Needs a DC Hub account with site-analysis | typed |
get_composite_site_score | Use this when the user wants one 0-100 data center site verdict from measured factors only (power, fiber, hazard, water), with coverage map. Needs a DC Hub account with site-analysis access; without o | typed |
generate_site_analysis | Use this when the user wants a Site Analysis PDF for one lat/lon (power, gas, water, permitting, fiber, latency, market, tax), link valid about 7 days. Needs a DC Hub account with site-analysis access | typed |
get_disaster_risk | Use this when the user asks about natural-hazard risk at a US site (FEMA National Risk Index): flood, wildfire, hurricane, earthquake, heat, drought, tornado. | typed |
get_climate_intel | Use this when the user asks for seismic (USGS ASCE 7) or climate (NOAA) design inputs at a lat/lon, e.g. cooling degree-days. | typed |
get_infrastructure | Use this when the user asks what power infrastructure is near a site: substations, transmission lines, gas pipelines, power plants. | typed |
get_fiber_intel | Use this when the user asks about fiber routes or carriers for a market: long-haul, metro and dark fiber, by carrier or route type. | typed |
get_fiber_readiness | Use this when the user asks if a site (lat/lon) is fiber-ready: distance to a carrier-served facility, reachable carriers, single-carrier risk. | typed |
get_subsea_cables | Use this when the user asks about subsea cable landings near a point, or the subsea cable catalogue. | typed |
get_peering_intel | Use this when the user asks about internet exchange and peering density near a lat/lon (PeeringDB), or top peering facilities. | typed |
get_metro_fiber | Use this when the user asks about a US metro's fiber: carriers, route miles, on-net buildings, density score, exchanges, carrier hotels. | typed |
get_energy_prices | Use this when the user asks about electricity or gas prices by US state or ISO: retail, wholesale, natural gas. | typed |
get_renewable_energy | Use this when the user asks about renewable energy for a US state or site: generation mix and PPA sizing inputs. | typed |
get_tax_incentives | Use this when the user asks about data center tax incentives in a US state: exemptions, abatements, thresholds. | typed |
get_water_risk | Use this when the user asks about water stress at a US site or state, for data center cooling. | typed |
get_grid_intelligence | Use this when the user asks about grid capacity or time to power in one US ISO: demand, fuel mix, excess-power and constraint bands, queue. | typed |
get_backup_status | Use this when the user asks how current DC Hub's data feeds are: health, record count and refresh interval per feed. | typed |
summarize_for_citation | Use this when you quote a DC Hub figure: an attribution line with the licence for its data layer. | typed |
rank_markets | Use this when the user wants data center markets ranked by one criterion (e.g. ai_ready for power), by region or minimum MW. | incomplete |
find_alternatives | Use this when the user wants data center facilities similar to one they name, with similarity scores and differences. | typed |
score_facility | Use this when the user wants one data center facility graded 0-100: power, fiber, water, climate, tax, talent, expansion. | typed |
ai_capacity_index | Use this when the user asks where large AI compute capacity could land in 30, 60 or 90 days, by data center market. | typed |
hyperscaler_deals | Use this when the user asks about hyperscaler or AI data center deals and announcements, with amounts and MW. | typed |
site_selection_canvas | Use this when the user wants a data center market shortlist for a MW target, geography and deadline: DCPI verdict, headroom, time to power. | typed |
grid_transition_radar | Use this when the user asks where new grid headroom for large data center loads is emerging, by US market and ISO. | typed |
deal_autopsy | Use this when the user asks what recent data center deals mean for power: each market's DCPI verdict and time to power. | typed |
get_permitting_intel | Use this when the user asks about data center permitting or moratoriums by jurisdiction: zoning, tax changes, utility pauses, stage-tagged with sources. | typed |
simulate_scenario | Use this when the user asks how data center power market rankings move under what-if changes (power price, time to power, queue wait, reserve margin). | typed |
plan_fiber_leadin | Use this when the user asks how to get diverse fiber into a data center site: road-following lead-in routes, distances, indicative cost, shared corridors. | typed |
cluster_sites_by_latency | Use this when the user asks which of 2-8 data center sites can form low-latency clusters (round-trip time floors). | typed |
Badge
Paste into your README. It updates on every verification.
[](https://app.agent-xm.com/a/cloud-dchub-mcp-server-streamable-http)
Was this agent useful?
Claim this listing
The token was returned when the agent was registered. No token? Prove the domain or repository instead.